Field installation · Capital Region, NY
Commercial metal wall panel installation across the Capital Region
Sub-framing, air barriers, continuous insulation and metal wall panels set true to line by our own insured crews using lifts and company-owned pipe scaffold.
Call or text (518) 888-7938
Book spring work now. Winter assessments and estimates available.
Updated November 2026

AI-generated illustration
Short answer
Our own insured crews install commercial metal wall panels across Albany and the Capital Region, working from lifts and company-owned pipe scaffold. Whether we fabricate the panels or install panels furnished by others, we set sub-framing, air and water barriers, continuous insulation, clips, trims and sealant joints to the approved shop drawings. Send drawings for a free quote.
Key facts
- Service area
- Albany, Schenectady, Troy, Saratoga Springs, Clifton Park, Glens Falls and jobs within about two hours of Albany.
- Season
- Panel installation runs most of the year. Sealant joints and barrier work are done on dry, frost-free surfaces.
- Who does the work
- Our own crews, from The Dom Construction Group LLC.
- Insurance
- General liability, umbrella and workers' compensation insurance; certificates on request.
- Estimates
- Free. Start with 3–5 photos by text, or use the form.
- Reply
- We reply within one business day, Monday to Friday.
Substrate prep, air barriers and sub-framing
A flat panel facade depends on what happens behind the cladding before the first panel comes off the crate. Before hanging metal wall panels, our field crews check exterior sheathing tolerances, steel stud or masonry backup alignment, and rough openings at storefront frames and louvers.
Where our scope includes the weather envelope behind the cladding, we apply fluid-applied or sheet air and water-resistive barriers, flash window heads, sills and jambs, and install rigid mineral wool or foam continuous insulation. Over that backup wall we lay out and laser-level the sub-framing: aluminum or galvanized steel Z-girts, hat channels, or thermally broken clip-and-rail brackets, shimmed true to plane so slight waves in the backup wall never telegraph into the finished panel face.
Hanging panels, setting reveals and transitions
Field attachment follows the project's engineered shop drawings and the panel manufacturer's tested assembly specified by the design team. Depending on the system, our crews install:
- Perimeter extrusion and track systems: Aluminum extrusions fastened to sub-framing in sequence, locking panel returns into place along crisp horizontal and vertical sightlines.
- Hook-on clip rainscreen systems: Panels fabricated with side pins or rear clips that hang on slotted vertical rails, allowing dry or open joints and individual panel removal if an elevation ever suffers vehicle or equipment damage.
- Wet-seal route-and-return joints: Roughly 1/2-inch panel reveals packed with properly sized backer rod and tooled with non-staining silicone waterproofing sealant, including clean perimeter transitions where metal meets brick, EIFS, stucco or curtainwall aluminum.
Throughout installation, crews check reveal widths with spacer gauges, align sightlines across window mullions and inside/outside corners, set drip flashings and aluminum plate copings, and peel the directional protective film once overhead work is clear.
Site access with our own supported scaffold
Commercial wall panel work demands steady, safe access along full elevations, canopies and soffits. Unlike subcontractors who wait on third-party access schedules, The Dom Construction Group LLC owns supported pipe and frame scaffolding erected and dismantled by our own crew, and operates boom and scissor lifts where site grading allows. Having company-owned pipe scaffold and aerial lifts under our own schedule keeps panel installation moving steadily on storefronts, schools, medical offices and commercial facades across the Capital Region.
Installing owner-furnished or third-party panels
General contractors and national retail or healthcare owners sometimes purchase a pre-fabricated ACM or plate package directly from a regional supplier and need an insured local crew to put it on the wall. We regularly price installation-only packages alongside our combined shop fabrication and install bids.
Send us the architectural elevations, wall sections and any vendor shop drawings you already have. We review panel counts, sub-framing responsibility, insulation, sealant joints and site access so your buyout has clear scope boundaries with no gaps between trades. Our crews carry general liability, umbrella and workers' compensation insurance, and our company is registered on the New York State public work contractor registry. Submit drawings on our bid request page or contact us for free pricing.
Field installation step by step
How our crews take a commercial elevation from bare sheathing to peeled, finished panels.
Substrate check and weather barrier
We verify backup framing alignment and openings, then install air and water barriers, flashings and continuous insulation where scoped.
Laser-leveled sub-framing
Galvanized girts, hat channels or thermally broken rail clips are shimmed flat and fastened to structural framing.
Panel hanging and reveal alignment
Crews set panels from lifts or company-owned pipe scaffold, checking horizontal and vertical sightlines with spacer gauges.
Joint detailing and film removal
Dry splines or wet-seal silicone joints, copings and perimeter closures are finished before peeling the protective face film.
Sub-framing, hanging hardware and joint details

AI-generated illustration

AI-generated illustration

AI-generated illustration
Field installation questions
Will your crews install metal panels that were fabricated by another supplier?
Yes. General contractors and multi-site commercial owners sometimes purchase pre-fabricated ACM or plate panels directly from a national vendor and hire us strictly for field installation. We review the supplier's shop drawings beforehand to confirm whether sub-framing, fasteners, shims, air barriers, insulation and joint sealants belong in our scope or another trade's.
Who installs the air barrier, continuous insulation and girts behind the panels?
We can include the complete backup assembly behind the cladding—sheet or fluid-applied air and water barriers, through-wall flashings, mineral wool or foam continuous insulation, and galvanized steel or aluminum girts and clips—or install panels over a backup wall prepared by another framing contractor. Putting both under one crew avoids tolerance disputes.
How do your crews access upper commercial elevations?
Our company owns supported pipe and frame scaffolding set and dismantled by our own crew, and uses boom lifts and scissor lifts where paved aprons or compacted ground allow. Owning supported scaffold lets us stage long storefront bands, canopies and multi-story commercial walls safely on our own schedule.
Can metal wall panels be installed during Upstate New York winters?
Mechanical work—fastening girts, setting mineral wool insulation and hanging dry-joint rainscreen panels—can proceed in cold dry weather whenever wind and footing are safe for lift and scaffold crews. Fluid-applied air barriers and wet-seal silicone joints have manufacturer substrate temperature and moisture limits, so cold-weather sequencing follows product data sheets.
How do you handle transitions where panels meet storefront glass, brick or EIFS?
Clean perimeter transitions prevent leaks at the edges of a panel field. Our crews set metal closure trims, J-molds or perimeter extrusions at consistent reveal widths against window frames, masonry control lines and EIFS terminations, then install closed-cell backer rod and compatible low-modulus silicone sealant where drawings call for sealed perimeter joints.
Get an installation quote for your facade
Tell us whether panels are furnished by others or if you want both shop fabrication and field install.
Shop work and wall assemblies
- Shop fabrication
Combine field hanging with CNC-routed panels built in our Albany shop.
- Rainscreen systems
Dry-joint and open-joint clip-and-rail rainscreen installations.
- Facade waterproofing
Air and water barriers, window flashings and silicone joint sealants.
- Supported scaffolding
Company-owned pipe and frame scaffold erected by our own crew.