Air and water barriers behind exterior cladding
Every metal wall panel facade—especially an open-joint or dry-joint rainscreen system—depends on a continuous air and water-resistive barrier over the exterior sheathing. Panels shed most of the rain and snow, while the barrier behind the sub-framing stops air leakage and directs any moisture that enters the cavity safely back to the exterior.
Our own crews install sheet-applied membranes and fluid-applied air and water barriers before continuous insulation, thermally broken clips, Z-girts or hat channels go on the wall. Careful detailing happens before cladding ever hides the substrate: lapping flashings shingle-style, sealing rough openings at windows and louvers, striping fastener penetrations and clip bases where required by the membrane specification, and tying wall barriers cleanly into roof edges and foundation waterproofing.
Silicone panel joints and perimeter transitions
On wet-seal route-and-return ACM panels and plate panels, the joint sealant is the primary weather seal. Panel reveals—typically around 1/2 inch wide—receive closed-cell or non-gassing backer rod set to uniform depth so the silicone sealant forms an hourglass profile bonded only to the two opposing panel returns. Three-sided adhesion tears sealant apart during Upstate New York winter contraction and summer heat; proper backer-rod sizing lets the joint stretch and compress without pulling off the PVDF coating.
We also cut out and replace failed perimeter caulking where metal panels meet aluminum storefront frames, brick masonry, cast stone, EIFS or cement stucco. Dissimilar materials expand at different rates and often require primers, bond-breaker tape and non-staining silicone formulations that will not bleed plasticizers onto porous stone or metal finishes.
Through-wall flashings, copings and breathable coatings
Water rarely enters through the middle of an intact panel or plaster field; it gets in at edges, caps and unsealed transitions. Our waterproofing scope covers:
- Sheet-metal and membrane flashings at window heads, sill pans, ledger angles, kick-outs where rooflines meet vertical walls, and shelf angles.
- Parapet coping seals, including internal splice plates, butyl or silicone bed seals, and secondary membrane wraps beneath metal copings so wind-driven rain cannot run down the back of the facade.
- Breathable elastomeric and masonry coatings over concrete block, precast, stucco and EIFS elevations, bridging hairline cracks while allowing trapped interior water vapor to escape rather than blistering in freeze-thaw weather.
One subcontractor for cladding and joint sealants
Splitting cladding and facade sealants between separate subcontractors often creates schedule gaps—panels sit unsealed before winter, or trades argue over whether a leak started at a window head, an air barrier lap or a panel joint. Because The Dom Construction Group LLC handles metal wall panels, EIFS, stucco, waterproofing and supported pipe scaffold with our own insured crew, general contractors and building owners can keep the weather seal under one contract.
Our field team has about 19 years of experience in EIFS, stucco, masonry and coatings, and we price both standalone commercial waterproofing packages and combined envelope scopes from your drawings or site photos. Note that our envelope work covers vertical walls, soffits, canopies and parapet copings—not roofing systems. Call or text (518) 888-7938 or submit plans on our bid request page. We reply within one business day, Monday to Friday.